| Kodiak O&G to Ramp Up Production at Williston Basin |
|
|
|
| Tuesday, 07 February 2012 00:00 |
|
The 2012 to 2013 drilling program is designed so that Kodiak is positioned to have nearly all of its acreage held by production by mid-2013, eliminating leasehold expiry across much of its 155,000 net acre position in the Williston Basin.
|